

We evaluate your critical loads to size the generator correctly (whole building vs. essential systems).

We determine the best location for the unit and the automatic transfer switch (ATS).

We pour the concrete pad, set the unit, and connect the electrical and fuel lines (natural gas or propane).

We simulate a power outage to ensure the system transfers power automatically and seamlessly.